Image
photo_refuge_de_rosuel_en_hiver
Image
la vidange de novembre
To prepare the building to the very low temperature, we need to get out all the water, in order to avoid freezing.
The entire water circuit had to be drained: pipes, taps, water heaters, toilets... Yes: even inside the building, temperatures drop well below 0°.